The lender named on our CMHC certificate never funded a dollar of this build. That wasn’t a mistake. That was the strategy.
Before we start, read this part twice.
Commercial financing is not residential financing with bigger numbers. It is its own world. Terms, covenants, reporting, guarantees, and the criteria move by lender, by asset class, by year, and sometimes by the underwriter who happens to open your file.
Go one layer deeper into CMHC and it gets more nuanced again. There are several programs. They each carry different requirements. They change. What was available two years ago may not be available today, and what worked on this deal may not fit yours at all.
And I know exactly what a lot of investors do when they hit that paragraph. They decide it’s too complicated and they walk.
Most people dismiss CMHC on the surface. Not because they studied it and it didn’t fit their deal. Because they glanced at it, saw a federal agency and a stack of conditions and a decade-long covenant, and decided it wasn’t worth the headache.
Am I dying to have a government agency inside my capital stack? No. Given the choice I’d rather do all of this without one.
But that isn’t the choice on offer. The choice is whether you’re willing to learn the terrain.
Lean into the complexity. The complexity IS the opportunity. It is the reason the terms are what they are, and it is the reason most of your competition tapped out three steps before the good part.
Be a resident of the land, not a tourist of the land.
So nothing below is a recipe. It is one deal, told directionally, so you can see the SHAPE of the thing.
And here’s the real lesson before the post even starts. We did not figure this out alone. Mortgage broker, quantity surveyor, builder, lawyer, accountant, and capital partners who trusted the plan before there was anything to look at. Every single one of them was load bearing. Pull any one out and this building does not exist.

What I got wrong for twenty years
I thought financing was a conversation.
Sit down with the banker. Build the relationship. Tell the story well. Be likeable, be prepared, be the kind of person somebody wants to back.
I wrote a book on raising money. I have made a career out of the relationship part. And I carried that belief straight into ground-up construction, where it is almost entirely useless.
Here’s the part that stung.
Nobody at CMHC ever met me. Nobody looked me in the eye. Nobody got charmed. A file arrived, and a file got underwritten.
Financing a build is not a conversation. It’s a package.

The actual order of operations
We bought the land first.
Then nothing happened for a while, and in the last post I told you those months were me being stuck on floor plans. True. But underneath the stalling, something else was going on, and it’s the part worth copying.
We were building the package.
Designs. Drawings. Third party reports. A quantity surveyor. A real budget, not a napkin. A fixed price contract with a builder, bonded. A proforma with unit sizes, rents, vacancy and operating costs, defensible line by line.
THAT is what got submitted. Not me. Not my track record. The paper.
And here’s the detail that reframed the whole process for us.
When the application went in, we didn’t even have a lender picked. A lender’s name went on the form because the form needed one. Once the approval came back, our broker took it out and shopped it on our behalf.
Quick clarification, because this trips people up. We are not talking about property insurance here. In the CMHC world the approval document is called a Certificate of Insurance, the COI. It is CMHC agreeing to insure the mortgage. It is a lending instrument, not a policy on the roof.
The COI came first. The bank was the last decision we made.
Sit with that. Most investors burn their energy hunting for a bank that will say yes. That’s backwards. Get the project insured, and banks compete to hold insured paper.

We drew it. The money validated it.
Let me be precise here, because it would be easy to overclaim.
The financing did not design this building. We did. The land, the drawings, the suite mix, the build cost, the contract, all of that existed on paper before a single underwriter saw it.
What the program did was hand us a list of conditions the design had to satisfy, and then grade our homework against it.
The program set the affordability requirement. A share of the units had to be designated affordable, priced against median renter income in that market, held there for ten years. That is not an architectural preference. That is a program condition that becomes a suite mix.
The program set the amortization. Fifty years. Not twenty-five. Which drops the payment, which lets the coverage ratio clear, which pushes the loan amount UP.
The program set a rate ceiling on the initial term. Locked into the file, honoured later, through everything that happened to rates in between.
And the coverage ratio was the referee. Every design choice had to leave the finished rent roll above that line.
So the order on this deal was land, then plan, then money. And the money’s job was to validate what we’d already built. It stamped the loan to cost. It stamped the rents. It stamped the numbers.
Now here’s the confession.
On this one, we were the guinea pigs. It was our first time through this process. We bought the dirt, drew the building, priced the build, and THEN went and found out whether the financing would carry it. We got a yes. We could just as easily have gotten a no, after the land was already ours.
We don’t work that way anymore.
Today we know our land costs and we know our construction costs, so we get a financing opinion up front and let it tell us what we can afford to pay for the dirt. The number comes back before we write the offer, not after.
That reversal deserves its own post, and it’s coming. For now just take the lesson without the scar: we got away with doing it backwards. Don’t plan on it.

About that loan to cost number
Directionally, this project underwrote at about 92.5% loan to cost.
Read it again if you’ve been telling yourself ground-up needs a third down. But do not read it lazily, because the interesting word in that sentence is not 92.5%.
It’s COST.
Cost is not just land and lumber. On a file like this, cost is the whole stack. And there is real flexibility, and real creativity, in what belongs in it.
The interest reserve was inside the loan. The budget carried roughly $90,000 for construction interest, and it was financed. The bank advanced us the money to pay the bank. We did not carry that out of pocket month after month, which is exactly where a lot of self-funded builds quietly bleed out. Actual carry came in comfortably under the reserve, which is what a properly built budget is supposed to do.
The CMHC premium and the financing fees were financed at source. Roughly forty grand, funded on the first draw, never out of our pocket. On plenty of deals that alone is the down payment.
The project paid a management fee to the owners during the build. $18,900, released in the spring, while the site was still a hole in the ground. Not on completion. Not on refinance. During.
Soft costs, reports, the surveyor, GST, all of it lands somewhere in that stack too.
So 92.5% is a real number and it is also a moving target. What you can legitimately build into cost is where the experience lives. That is a conversation with a good broker and a good accountant, not a rule you can look up.
Add it all up and the fresh cash that actually crossed the table was a fraction of what most people assume. Most of the equity in this deal was value already sitting in the dirt, not a wire transfer.

Now the back nine
If we stopped there, this reads like a highlight reel. So here’s the part that never makes the highlight reel.
The paperwork does not stop when the loan closes. It barely starts.
A quantity surveyor reviews and signs off on every single progress advance. The architect certifies compliance before every advance. There’s an income target the building has to reach, with money owed against the loan until it gets there. The personal guarantee only steps down after the property holds that income for twelve straight months.
Twelve consecutive months. Not ribbon-cutting day.
And a ten year affordability covenant sits on title, which is a commitment we made on purpose and would make again, but it is a commitment. It travels with the building.
The deal wasn’t done when the tenants moved in. The deal was done a year after that.
That’s the back nine. That’s why this series exists.
One quick note before somebody heads to the comments. Yes, at this leverage the cash flow line reads differently than a low-leverage deal. Cash flow numbers mean nothing on their own. They only mean something next to the capital that produced them. Eight thousand a year on eighty thousand invested is a completely different animal than three thousand a year on a hundred thousand invested, and most investors compare those two side by side without blinking. That’s an entire series, and I’m going to write it. Not today.
Do this before you draw anything
- Stop asking who will lend on this. Start asking what you have to hand somebody.
- Write the package list tonight. Designs. Drawings. Third party reports. Quantity surveyor. Fixed price bonded contract. A proforma with real rents and real operating costs.
- Circle what you don’t have yet. That gap is your actual to-do list. It is not glamorous and it is the entire job.
- Then call a broker who does CMHC multi-unit financing and ask what’s missing from your list. Not “will you finance this.” Ask what the file needs.
One phone call. Make it before you fall in love with a floor plan.

Last thing
If you’ve written off ground-up because you assumed it takes a third in cash, that number came from running the deal in the wrong order.
Build the package, and the cash requirement gets a lot smaller.
Simple. Not easy. There is a mountain of paper, a surveyor with a pen, a ten year covenant on title, and a version of this story where a bad budget eats you alive. Go in with your eyes open.
But it is doable. And you should not be doing it by yourself. I’ve watched capable people get their first one across the line with less experience than you already have. What they had was a team.
Before you commit a dollar, get the numbers stress tested
Most deals do not die on the spreadsheet. They die on the version of the spreadsheet nobody built.
What happens if the build runs four months long. If rents land eight percent under proforma. If the rate ceiling is where you actually land instead of where you hoped. If two units sit empty for a season. If a change order shows up in month seven.
That’s the work I do with people. A fully costed, conservative analysis with the what-if scenarios built in, before you’re committed and it’s expensive to be wrong.
Bring me a lot, a tired little property, a set of drawings, or just a number you can’t get out of your head.
Book a free consultation here and let’s pressure test it together.
No pitch. Just an honest read on whether the deal survives a bad year.
I believe you can build this. Now go make the phone call.
In your corner,

Russell Westcott